ER15-JSI-02

From ERwiki

(Difference between revisions)
Jump to: navigation, search
(DOCUMENTATION)
(PROJECT OBJECTIVES)
 
(9 intermediate revisions not shown)
Line 32: Line 32:
The main project objectives are:
The main project objectives are:
* '''O1 ->''' Review possible approaches of complexity reduction for fast Model Predictive Control (MPC) suitable for Plasma Current and Shape Control (PSC) and possibly to Resistive Wall Modes (RWM) control
* '''O1 ->''' Review possible approaches of complexity reduction for fast Model Predictive Control (MPC) suitable for Plasma Current and Shape Control (PSC) and possibly to Resistive Wall Modes (RWM) control
-
* '''O2 >>''' Implement the most appropriate fast MPC method  
+
* '''O2 ->''' Implement the most appropriate fast MPC method  
-
* '''O3 >>''' Adapt plasma models for use in MPC and prepare a set of models in different operation points of an ITER scenario, in order to assess robustness  
+
* '''O3 ->''' Adapt plasma models for use in MPC and prepare a set of models in different operation points of an ITER scenario, in order to assess robustness  
-
* '''O4 >>''' Develop a suitable state-estimation technique  
+
* '''O4 ->''' Develop a suitable state-estimation technique  
-
* '''O5 >>''' Apply fast MPC to PSC control  
+
* '''O5 ->''' Apply fast MPC to PSC control  
-
* '''O6 >>''' Evaluate fast MPC performance and robustness to disturbances and variation of local dynamics in comparison to existing approaches
+
* '''O6 ->''' Evaluate fast MPC performance and robustness to disturbances and variation of local dynamics in comparison to existing approaches
-
* '''O7 >>''' Evaluate the applicability of fast MPC to RWM control
+
* '''O7 ->''' Evaluate the applicability of fast MPC to RWM control
== DOCUMENTATION ==
== DOCUMENTATION ==
Line 51: Line 51:
|-
|-
|style="color:#000"|
|style="color:#000"|
-
* [[Media:Minutes_CLA_KOM_(04_11_10).pdf | Kick-off Meeting (Nov 4th 2010) ]]
+
* [[Media:Minutes_ER_KOM_24_26_3_2015.pdf | Kick-off Meeting (Mar 24th-26th 2015) ]]
-
* [[Media:CLA_-_SD_Meeting_-_Minutes.pdf | Design Review (Jan 31th 2011) ]]
+
-
* [[Media:Minutes_CLA_PM1_(16_12_10).pdf | Progress Meeting #1 (Dec 16th 2010) ]]
+
-
* [[Media:Minutes_CLA_PM2_(15_02_11).pdf | Progress Meeting #2 (Feb 15th 2011) ]]
+
-
* [[Media:Minutes_CLA_PM3_(09_05_11).pdf | Progress Meeting #3 (May 9th 2011) ]]
+
-
* [[Media:Minutes_CLA_PM4_(27_07_11).pdf | Progress Meeting #4 (Jul 27th 2011) ]]
+
-
* [[Media:Minutes_CLA_PM5_(07_12_11).pdf | Progress Meeting #5 (Dec 7th 2011) ]]
+
|}
|}
Line 69: Line 63:
|-
|-
|style="color:#000"|
|style="color:#000"|
-
* [[Media:FMPCFMPC_KoM_Samo.pptx | Fast Model Predictive Control for Magnetic Plasma Control - Kick-off Meeting - S. Gerksic (Mar 24th 2015)]]
+
* [[Media:FMPCFMPC_KoM_Samo.pdf | Fast Model Predictive Control for Magnetic Plasma Control - Kick-off Meeting - S. Gerksic (Mar 24th 2015)]]
 +
* [[Media:FMPCFMPC_KoM_Samo_MPC.pdf | Fast Model Predictive Control for Magnetic Plasma Control - S. Gerksic (Mar 24th 2015)]]
 +
* [[Media:OverviewCREATEModellingTools.pdf | CREATE Tools for plasma magnetic modelling and control - G. De Tommasi (Mar 25th 2015)]]
 +
* [[Media:ERMeetingMar2015_AP.pdf | Design of a realistic feedback+feedforward control scheme able to manage the whole plasma pulse - A. Pironti (Mar 25th 2015)]]
 +
* [[Media:ARIOLA_KOM_ER.pdf | Simultaneous control of modes with multiple toroidal periodicity in tokamak plasmas - M. Ariola (Mar 25th 2015)]]
 +
* [[Media:De_Tommasi_-_Plasma_Models_for_the_design_of_the_ITER_PCS.pdf | Plasma Models for the design of the ITER PCS - G. De Tommasi (Mar 26th 2016)]]
 +
* [[Media:ERMeetingMar2015_AP_1.pdf | ITER magnetic axisymmetric control system - A. Pironti (Mar 26th 2016)]]
 +
* [[Media:ERMeetingMar2015_AP_2.pdf | ITER reference scenarios and disturbances for performance assessment - A. Pironti (Mar 26th 2016)]]
 +
* [[Media:FMPCFMPC_LJfeb16_Samo_MPC.pdf | MPC for Plasma Magnetic Control - S. Gerkšič (Mar 26th 2016)]]
 +
* [[Media:FMPCFMPC_LJfeb16_Matija.pdf | MPC using fast online 1st-order QP methods - M. Perne (Mar 26th 2016)]]
 +
* [[Media:FMPCFMPC_LJfeb16_bostjan_fastQPonPlasma.pdf | Plasma MPC control implementation using fast QP solver - B. Pregelj (Mar 26th 2016)]]
 +
* [[Media:ARIOLA_RWM.pdf | CREATE ITER RWM control system - M. Ariola (Mar 26th 2016)]]
 +
* [[Media:FMPCFMPC_LJfeb16_Samo.pdf | FMPCFMPC Project Review Meeting Ljubljana Feb. 2016 - S. Gerkšič (Mar 26th 2016)]]
 +
|}
 +
 
 +
 
 +
{| width="100%" cellpadding="2" cellspacing="5" style="vertical-align:top;background-color:#A1F7A6"
 +
! <p style="margin:0;background-color:#A4FF75;font-size:120%;font-weight:bold;border:1px solid #000000;text-align:left;color:#000;padding:0.2em 0.4em;">Deliverables</p>
 +
|-
 +
|style="color:#000"|
 +
* [[Media:FMPCFMPC_D1_v3.pdf | D1: A set of reduced-order models and a state-estimation scheme for ITER plasma shape and current control ]]
 +
* [[Media:FMPCFMPC_D2_v1.1.pdf | D2: Conceptual design of fast MPC for ITER PCSC ]]
 +
* [[Media:FMPCFMPC_D3_v1.0.pdf | D3: Fast MPC implementation ]]
|}
|}
|}
|}
</span>
</span>
<span>
<span>

Latest revision as of 20:00, 11 January 2017

Fast Model Predictive Control for Magnetic Plasma Control

Principal Investigator:

Samo Gerksic (IJS)

Contributors:

Gianmaria De Tommasi (CREATE)

Marco Ariola (CREATE)

Alfredo Pironti (CREATE)

Boštjan Pregelj (IJS)

Andrej Debenjak (IJS)

Participating institutions:

Institut "Jožef Stefan", Ljubljana, Slovenia

Consorzio CREATE, Naples, Italy

COSYLAB, Ljubljana, Slovenia

Page last edited on 11-1-2017

PROJECT OBJECTIVES

The main project objectives are:

  • O1 -> Review possible approaches of complexity reduction for fast Model Predictive Control (MPC) suitable for Plasma Current and Shape Control (PSC) and possibly to Resistive Wall Modes (RWM) control
  • O2 -> Implement the most appropriate fast MPC method
  • O3 -> Adapt plasma models for use in MPC and prepare a set of models in different operation points of an ITER scenario, in order to assess robustness
  • O4 -> Develop a suitable state-estimation technique
  • O5 -> Apply fast MPC to PSC control
  • O6 -> Evaluate fast MPC performance and robustness to disturbances and variation of local dynamics in comparison to existing approaches
  • O7 -> Evaluate the applicability of fast MPC to RWM control

DOCUMENTATION


Minutes of Meetings


Presentations


Deliverables

Personal tools