ER15-JSI-02

From ERwiki

(Difference between revisions)
Jump to: navigation, search
(DOCUMENTATION)
Line 68: Line 68:
* [[Media:ERMeetingMar2015_AP.pdf | Design of a realistic feedback+feedforward control scheme able to manage the whole plasma pulse - A. Pironti (Mar 25th 2015)]]
* [[Media:ERMeetingMar2015_AP.pdf | Design of a realistic feedback+feedforward control scheme able to manage the whole plasma pulse - A. Pironti (Mar 25th 2015)]]
* [[Media:ARIOLA_KOM_ER.pdf | Simultaneous control of modes with multiple toroidal periodicity in tokamak plasmas - M. Ariola (Mar 25th 2015)]]
* [[Media:ARIOLA_KOM_ER.pdf | Simultaneous control of modes with multiple toroidal periodicity in tokamak plasmas - M. Ariola (Mar 25th 2015)]]
 +
|}
 +
 +
{| width="100%" cellpadding="2" cellspacing="5" style="vertical-align:top;background-color:#A1F7A6"
 +
! <p style="margin:0;background-color:#A4FF75;font-size:120%;font-weight:bold;border:1px solid #000000;text-align:left;color:#000;padding:0.2em 0.4em;">Deliverables</p>
 +
|-
 +
|style="color:#000"|
 +
* [[Media:FMPCFMPC_D1_v2.pdf | D1: A set of reduced-order models and a state-estimation scheme for ITER plasma shape and current control ]]
|}
|}
|}
|}
</span>
</span>
<span>
<span>

Revision as of 14:34, 28 July 2015

Fast Model Predictive Control for Magnetic Plasma Control

Principal Investigator:

Samo Gerksic (IJS)

Contributors:

Gianmaria De Tommasi (CREATE)

Marco Ariola (CREATE)

Alfredo Pironti (CREATE)

Boštjan Pregelj (IJS)

Andrej Debenjak (IJS)

Participating institutions:

Institut "Jožef Stefan", Ljubljana, Slovenia

Consorzio CREATE, Naples, Italy

COSYLAB, Ljubljana, Slovenia

Page last edited on 28-7-2015

PROJECT OBJECTIVES

The main project objectives are:

  • O1 -> Review possible approaches of complexity reduction for fast Model Predictive Control (MPC) suitable for Plasma Current and Shape Control (PSC) and possibly to Resistive Wall Modes (RWM) control
  • O2 >> Implement the most appropriate fast MPC method
  • O3 >> Adapt plasma models for use in MPC and prepare a set of models in different operation points of an ITER scenario, in order to assess robustness
  • O4 >> Develop a suitable state-estimation technique
  • O5 >> Apply fast MPC to PSC control
  • O6 >> Evaluate fast MPC performance and robustness to disturbances and variation of local dynamics in comparison to existing approaches
  • O7 >> Evaluate the applicability of fast MPC to RWM control

DOCUMENTATION


Minutes of Meetings


Presentations


Deliverables

Personal tools